Renovation shop / swimming pool

This building received a new roof structure and roof sheets. At the same time the second level of the building was complete renovated inside and outside. Electrical installations and plumbing installation were renewed.

 

The shops in the building of which Shipwreck Shop is one stayed operational during the renovation works.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The Carib Swim Team swimming pool received a tunnel around the pool to perform an easier way of inspection of the pool walls. At the same time various concrete walls were inspected and where necessary the concrete was injected to stop leaks.

 

 

 

 

 

 

 

On this picture it shows a part of the works finished.

 

 

 

 

 

 

 

 

 

 

Under construction by Liccom.